Purpose

The Oklahoma Department of Transportation (ODOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to replace two bridges on SH-9 over Flat Rock Creek and Wallace Creek. The existing SH-9 roadway has two (2) 12 foot wide paved driving lanes with 5 foot wide paved shoulders. In this area, the SH-9 roadway curves through the two bridge locations. The purpose and need of the project is to correct a bridge that is at risk of becoming structurally deficient over Flat Rock Creek and a structurally deficient bridge over Wallace Creek. ODOT will host an open house public meeting to present the proposed design for two bridges on SH-9 over Flat Rock and Wallace Creeks, located 6.0 and 6.2 miles east of junction of SH-52, in McIntosh County. The open house also provides an opportunity for the public to comment.

Click below for project location map.

Description

The proposed roadway improvement through both bridge areas consists of two (2) 12 foot wide paved driving lanes with 8 foot wide paved shoulders. An offset roadway alignment to the north is planned near Flat Rock Creek which improves the roadway geometry through the existing curve. A detour to the south, near NS-4060 Road is needed due to the intersection and Flat Rock Creek bridge location. An offset alignment to the south along with a shoo-fly to the south near Wallace Creek will avoid impacts to wetlands on the north side of SH-9 near Wallace Creek. 

The Flat Rock Creek bridge will be replaced with a 40 foot clear roadway width span bridge on an offset alignment to the north. The Wallace Creek bridge will be replaced with a 100 foot long reinforced concrete box on an offset alignment to the south. New right-of-way will be required. The road will remain open during construction.

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON OCTOBER 19, 2023

Submit Online:  Comment Form

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204

Last Modified on Oct 03, 2023
Back to Top