Skip to main content
Where When

Coweta Assembly of God

29707 East Highway 51

Coweta, Oklahoma 74429 (Map)

Thursday, February 29, 2024

4:00 PM - 6:30 PM

Contact:

Should you have any questions regarding this project, please email environment@odot.org, or call 405-325-3269 and leave a detailed message.

Purpose

The Oklahoma Department of Transportation (ODOT), in conjunction with Oklahoma Turnpike Authority (OTA) and Federal Highway Administration (FHWA) will host an open house public meeting to present the proposed improvements for the new SH-51 connection with the Muskogee Turnpike (SH-351) in Wagoner County. This is a come and go open house meeting with no formal presentation.

Description

Three design options were previously evaluated, and a Virtual Open House was held June 8, 2021 through June 22, 2021 seeking input from citizens, stakeholders, federal and state agencies, and public offi cials. As stated at that time, Alternative 3 was selected as the preferred. The preferred option provides a new Turnpike Interchange at S. 273rd E. Avenue, a new bridge located to the northwest of the current location and a new connection on new alignment to provide 4-lane divided connection from SH-51 to Muskogee Turnpike (SH-351). Three round-about connections are included between the Turnpike and SH-51. ODOT, and OTA have worked jointly with Wagoner County, City of Broken Arrow, City of Coweta and Indian Nations Council of Governments (INCOG) in development of this proposal. This connection is within INCOG’s 2045 Regional Transportation Plan, and both the Cities of Coweta and Broken Arrow are supportive of the project. The purpose and need of the project is to connect SH-51 to the Muskogee Turnpike (SH-351) to best serve the needs of the traveling public and be consistent with the Long Range Plans for the area.

The connector roadway section will consist of four (4)-12-foot-wide driving lanes with curb and gutter and raised grassed median or a 14-foot turn lane and 8-10 foot outside paved shoulders with a grass median. The connection will tie to the proposed Wagoner County widening of S. 273rd E. Avenue north of the Muskogee Turnpike that will consist of two (2)-12-foot driving lanes with a 14- oot turn lane with 10-foot paved shoulders.

The Turnpike interchange is located at S.273rd E. Avenue.

New bridge is located to the northwest of the existing bridge location.

New connection is on new alignment to provide the roadway connection from SH-51 to Muskogee Turnpike (SH-351).

Three round-about connections are included between the Turnpike and SH-51, one of which will form the new intersection between E. 101st Street / S. 273rd E. Avenue & the connection Control of access will be obtained by ODOT for this project.

The Muskogee Turnpike will have tolls, but the connection from SH-51 to the Turnpike will not have a toll.

Location Map

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON MARCH 15, 2024

Submit Online:  Comment Form

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204

Last Modified on Jul 22, 2024
Back to Top