Skip to main content

US-59 in Adair County

Open House

Where When
Peavine Elementary School
77943 Highway 59 North
Stillwell, OK 74960 (Map)
Tuesday, October 29, 2019
Open House format
5:00p.m. to 7:00p.m.

Purpose:

The purpose of the Open House meeting is to inform the public of the proposed improvements, solicit input, and answer questions regarding construction activities, sequencing, and scheduling. The Open House meeting will use a come-and-go format, with no formal presentation.
 
Please click image below for project location map

 

Description:

The Oklahoma Department of Transportation (ODOT), in cooperation with the Federal Highway Administration (FHWA), proposes to make safety improvements to US-59 from approximately .025 mile south of SH-51 in Maryetta and extending north 5.25 miles in Adair County, Oklahoma. This segment of US-59 is a two-lane, open section, principal arterial facility with 12-footwide driving lanes and varying-width shoulders. There are two bridges and several roadway-sized drainage structures associated with this section of highway. Current traffic volumes are estimated at 10,000 vehicles per day (VPD) from the beginning of the project to one mile north of Maryetta, and 4,800 VPD to the end of the project. The purpose of the proposed improvements is to correct roadway deficiencies, enhance safety, and efficiently accommodate traffic.
ODOT is developing design plans for improving this segment of US-59 while taking into consideration the cost of construction, right-of-wayand utilities impacts, and environmental constraints. The proposed improvements include widening and resurfacing the highwayto create two, 12-footwide, paved shoulders on existing alignment. Some roadway sections will be curb and gutter, and some segments will have a dedicated passing lane. Turning lanes will be added at some intersections and at the PeavineSchool to accommodate high traffic counts. The existing bridges and structures will be widened.
 
The proposed design will meet current standards. Highway access would remain open during construction, and access to residences, businesses and schools would be maintained throughout the project duration.

Comments:

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON

November 12, 2019

 

Submit Online: COMMENT FORM

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/.

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21stStreet
Oklahoma City, OK 73105-3204

 

Contact:

ODOT

EnvironmentalPrograms Division

(405) 521-2321

environment@odot.org

Mr. Geoff Canty

CC Environmental

(405) 761-1225

geoff@ccenviro.net

Public Meeting Accessibility Notice

In accordance with the requirements of the Americans with Disabilities Act of 1990, the Oklahoma Department of Transportation (ODOT) will not and does not discriminate against qualified individuals with disabilities on the basis of disability in ODOT services, programs, activities, or employment practices. ODOT will provide reasonable accommodations for persons with disabilities, upon request. To request an accommodation, please contact the ADA/504/508 Coordinator at 405-521-4140 or Oklahoma Relay at 1-800-722-0353, no later than 72 hours before any scheduled event.

Last Modified on Mar 02, 2021
Back to Top