Skip to main content

I-44 and US-75 Interchange

Work Package 1, Tulsa County

Open House

 

Please click the link below for the virtual open house summary
JP 33788(04) I-44 and US-75 Interchange, Work Package 1, Tulsa County

 

Where When
Daniel Webster High School Cafeteria
1919 West 40th Street
Tulsa, OK 74107 (Map)

Thursday, January 30, 2020

5:30 p.m. to 7:30 p.m.

Contact:

Ms. Erin Faulkner
ODOT Environmental Programs Division
(405) 521-2315
environment@odot.org 
 
Ms. Kirsten McCullough
Garver USA
(918) 250-5922
Kjmccullough@garverusa.com

Purpose

The purpose of the open house is to update the public on the continued transportation improvements along the I-44 corridor and present the proposed design for Work Package 1. The open house will be a come and go event, no formal presentation will be conducted. Informational boards and displays will be available for the public to review. Project team members will be on hand to assist and answer questions. 

Please click image below for project location map
 

Description

The Oklahoma Department of Transportation (ODOT), in cooperation with the Federal Highway Administration (FHWA), is proposing improvements to the I-44 corridor from Union Ave. to the Arkansas River, including reconstruction of the I-44/US-75 interchange in the City of Tulsa, Tulsa County, Oklahoma (see attached map). I-44 is part of the Primary Highway Freight System, which includes the most critical highway portions of the nation’s freight transportation network. This portion of I-44 is one of the oldest remaining portions of interstate in Oklahoma and is the only remaining 4-lane piece in the Tulsa area. There is a high vehicle collision rate, and the existing highway will not adequately accommodate the anticipated future traffic volumes. The existing I-44/US-75 interchange experiences significant congestion in several directions during peak travel periods.

The purpose of this project is to improve safety and traffic operations and improve mobility in the I-44/US-75 corridor. ODOT conducted a preliminary engineering study in 2017 followed by a public meeting in November 2017 where alternative corridor improvements were presented. Please click here for a link to the previous meeting. Based on this study and public input ODOT selected a preferred design. Work Package 1, scheduled to begin construction in 2020, is the first in a series of five construction projects (Work Packages) required to complete the corridor improvements. Future Work Packages will be programmed into the 8 Year Construction Work Plan as funding becomes available to complete the ultimate improvements of the interchange and adjacent highway corridors.

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON FEBRUARY 13, 2020

Submit Online:  

COMMENT FORM (English)

COMMENT FORM (Chinese)

COMMENT FORM(Spanish)

COMMENT FORM (Vietnamese)

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204

Last Modified on Feb 26, 2021
Back to Top