Skip to main content

SH-82 in Cherokee County

Open House

 

Please click the link below for the virtual open house summary
JP 32097(04) SH-82 in Cherokee County

 

Where When
Cookson United Methodist Church
21685 West Cookson Bend Road
Cookson, OK (Map)

Thursday, February 13, 2020

5:00 p.m. to 7:00 p.m.

Contact:

Should you have any questions regarding this project, please email environment@odot.org, or call 405-325-3269 and leave a detailed message.


Purpose

The purpose of the open house is to inform the public of the proposed improvements and answer questions regarding construction activities, sequencing, and scheduling. 

Please click image below for project location map

Description

The Oklahoma Department of Transportation (ODOT), in cooperation with the Federal Highway Administration (FHWA), proposes to make safety improvements to SH-82 from 4 miles south of the SH-100/SH-82 junction and extending north approximately 3.7 miles in Cherokee County, Oklahoma. This segment of SH-82 is a two-lane facility with 12-foot wide driving lanes and varying width shoulders. There is an elevated accident rate caused by deteriorating pavement, limited sight distances, and narrow shoulders. There are two bridges within the project extent. The reinforced concrete box (RCB) bridge over an unnamed tributary to Elk Creek (NBI# 13149) is narrow with a 30-foot clear roadway. The span bridge over Elk Creek (NBI# 22384) has a 44-foot wide clear roadway. Current traffic volumes are estimated at 2,000 vehicles per day (VPD) and are projected to increase to 3,280 VPD by 2050. The purpose of the proposed project is to correct roadway deficiencies, enhance safety, and efficiently accommodate traffic.

ODOT is developing design plans for improving this segment of SH-82 while taking into consideration the cost of construction, right-of-way and utilities impacts, and environmental constraints. ODOT proposes to improve driving surfaces, reconfigure driveways and entrances, realign county road intersections, widen shoulders, and extend roadway structures and the RCB bridge to clearzone. The highway will be widened to create two 12-foot wide paved driving lanes with 6-foot wide paved shoulders on existing alignment. The RCB bridge will be lengthened to create a safe clear roadway width, and the guardrail will be replaced on the Elk Creek bridge. The proposed design will meet current standards.SH-82 will remain open during construction, and access to residences and businesses will be maintained throughout the project duration.

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON NOVEMBER 23, 2020

Submit Online:  Comment Form

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204

Last Modified on Feb 22, 2021
Back to Top