Please click the links below for the Alternative Selection Letter, Selected Alternative, Location Map, & Meeting Summary Addendum |
Please click the link below for the open house summary |
JP 33351(04) SH-11 in Kaw City in Kay County |
Where | When |
Kaw City Community Building 701 E. Morgan Street Kaw City, Oklahoma |
Tuesday, December 3, 2022 6:00 PM |
Contact:
Should you have any questions regarding this project, please email environment@odot.org, or call 405-325-3269 and leave a detailed message.
Purpose
The Oklahoma Department of Transportation will host an open house to present the proposed alternatives to improve SH-11 from west of Rocky Ridge Road east 3.9 miles to Grandview Drive in Kaw City and to provide an opportunity to submit comments prior to the detailed design phase for the project.
Please click the image below for project overview map
Description
The proposed project will reconstruct SH-11 with two 12-foot-wide driving lanes and 8-foot-wide shoulders on a new alignment. The design speed of the new highway will be 65 miles per hour in the west portion, reducing to 55 mph as the roadway approaches Kaw City. Two alignment alternatives are under consideration.
On the west portion, Alternative 1 follows the existing SH-11 as closely as possible while reconstructing curves to meet today’s design standards. East of Acker Hill Road, Alternative 1 continues east following Eagle Drive for approximately ½ mile before it rejoins existing SH-11. The intersections of Rocky Ridge Road and Bear Creek Road will be realigned. Properties with access to SH-11 today will have access to the new highway. The existing SH-11 pavement will be removed.
Alternative 2 is the same as Alternative 1 except between Rocky Ridge Road and Bear Creek Road, where Alternative 2 is offset further north. The alignment generally follows the section line and Redbud Road. A portion of the existing highway between Rocky Ridge Road and Bear Creek Road would remain in place to provide access to adjacent properties. Properties along Redbud Road would have direct access to the new highway.
Comments
ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON DECEMBER 20, 2022
Submit Online: Comment Form
NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/
Email: environment@odot.org
Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204