Skip to main content
Please click the link below for the virtual open house summary
JP 31872(04) US-270 Shawnee in Pottawatomie County
Where When
Due to concerns over the spread of COVID-19, this will be a web-based format (no in-person meeting) 
http://www.odot.org/US270Shawnee (link is no longer live)

The information will be available beginning January 12, 2022 and comments are requested by January 26, 2022.

Contact:

Should you have any questions regarding this project, please email environment@odot.org, or call 405-325-3269 and leave a detailed message.

Purpose

The virtual public open house will present the most recent design for the project and allow the public to submit input. The purpose of the open house is to present information about the project and obtain input from the public to further assist in the identification of critical social, economic and environmental effects that may result from the project.  

Please click the image below for project overview map

Description

The Oklahoma Department of Transportation (ODOT), in cooperation with the Federal Highway Administration (FHWA), is proposing replacement of the existing pavement section (including shoulders) and significant design changes to the Kickapoo Spur Interchange ramps. Please see the attached project location map. The purpose of the project is to reconstruct the pavement of US-270 to increase the longevity of the pavement and to improve the level of safety and operations throughout the corridor. The reconstruction of the pavement of US-270 is needed because the condition of the existing pavement has deteriorated to an unsatisfactory level and the current average daily traffic (ADT) is 16,240 vehicles per day and is projected to increase to 22,740 vehicles per day by 2040.

To improve safety and traffic flow, ODOT is developing design plans for improving this segment of US-270 while taking into consideration the cost of construction, right-of-way and utilities impacts, and environmental constraints. The project will reconstruct the pavement of US-270 from MacArthur Street south 2.1 miles to the Kickapoo Spur Interchange, extending 0.3 miles south to the bridges over the Union Pacific Railroad. The cable median barrier will be removed and reset in the central median. The Kickapoo Spur Interchange will be modified to a traditional diamond interchange by removing the two existing southbound on and off loop ramps and replacing them with modified taper-style ramps.

Comments

ALL COMMENTS NEED TO BE RECEIVED BY THE END OF BUSINESS ON JANUARY 26, 2022

Submit Online:  Comment Form

NOTE: To submit this Comment Form by email please download the form. Use your Adobe Reader to fill in your information and leave your comment, then select the Submit by Email button. You can also fill in the downloaded form and send it as an email attachment if you are on a public computer, or email your comments to environment@odot.org. If you do not currently have an Adobe Reader, you can download a free copy at https://get.adobe.com/reader/

Email: environment@odot.org

Address:
ODOT Environmental Programs Division
OKLAHOMA DEPARTMENT OF TRANSPORTATION
200 N.E. 21st Street
Oklahoma City, OK 73105-3204

Last Modified on Mar 08, 2022
Back to Top