Bridging the Gap: Multimodal Connections on I-35 over the Oklahoma River
Application Narrative
Preliminary Engineering
- Aesthetic Study Report
- Collision Analysis Report
- Cost Schedule Tables
- Design Concept 3_4 PNP MoT Exhibits
- Final Plan Sheet Set
- Level of Service Maps
- Long Span Bridge Type Study
- Preliminary DC 15th St Ramps Retaining Wall Locations
- Preliminary Lane Capacity Analysis Report
- Preliminary RW Utility Conflict
- Reconnaissance Report-Final
- Stakeholder Presentation
- I-35/I-40 Dallas Junction Interchange Final Engineering Report